INDUSTRIAL ELECTRICAL PROJECTS:

  • Erbud Industry Sp. z o.o.– installation of power supply to the construction site of the heat and power plant Elektrociepłownia Zabrze

  • Budimex S.A.– Installation of lighting fixtures, power supply of the construction site back office, earthing system and portable distribution box along with measurements in the heat and power plant Elektrociepłownia Zabrze.

  • Amec Foster Wheeler Energia Polska Sp z. o.o. – Installation of power supply to the control cabinet in a storage shed made of tin sheet on the construction site of the heat and power plant Elektrociepłownia Zabrze and installation of temporary lighting

  • OCMER Sp. z o.o.– Installation of electrical system connected to the construction of DB Schenker handling terminal with welfare and office facilities and auxiliary infrastructure in Stawigud, Olsztyn area.

  • OCMER Sp. z o.o.– Installation of electrical system connected to the construction of DB Schenker handling terminal with welfare and office facilities and auxiliary infrastructure in Stary Kisielin, Zielona Góra area.

  • OCMER Sp. z o.o.– Installation of electrical system connected to the construction of production hall Komahold terminal with welfare and office facilities and auxiliary infrastructure in Kudowa Zdrój

  • ETP S.A. – Electrical and assembly works in Zakłady Azotowe in Kędzierzyn-Koźle

  • ETP S.A. – Installation of indoor electrical system in an office building and two production halls of Mubea Automotiv Poland in Zimna Wódka

  • ETP S.A. – Extension of electrical installation of process line control in Colgate Palmolive Manufacturing Plant in Świdnica

  • ETP S.A. – Wiring, connection of Installation of Control Measurement Instruments and Automation devices and steering cabinets and Ethernet, Profinet and Profibus installations in Głogów Copper Smelter.

  • ETP S.A. – Electrical and assembly works in EDF Polska Electrical Power and Heating Plant in Gdynia

  • IPID Sp. z o.o. – Wiring and Automation and BMS installation for NGK Ceramics in Dąbrowa Górnicza

  • IPID Sp. z o.o. – Wiring of building automation system for Vistula Group in Cracow

  • Soning-Stal Sp. z o.o. – Electrical and assembly works in Hutchison plant in Rybnik

  • UNIMA 2000 Systemy Teleinformatyczne S.A – Comprehensive electrical installation, cable ducts and exterior lighting for factory floors and storage facilities Sekonix Poland in Żory

  • UNIMA 2000 Systemy Teleinformatyczne S.A – Conduits for electrical system and overhead cabling for a new power unit in Turów Power Plant.

  • UNIMA 2000 Systemy Teleinformatyczne S.A – Cabling, BMS and automation for Karuzela Shopping Centre in Września.

  • STP ELBUD Sp. z o.o. – Lighting in the sports arena of Cracow University of Technology

  • Stolzle Częstochowa Sp. z o.o. – Power supply installation of processing line in the Decorations Unit.

  • Stolzle Wymiarki Sp. z o.o. – Conduits for electrical system and electrical system in Stolzle Glassworks in Wymiarki

  • Stolzle Wymiarki Sp. z o.o. – Conduits for electrical system

  • Stölzle Lausitz GmbH – Lighting for Storage Facilities, the road and the parking lot

  • Stölzle Lausitz GmbH – Cable ducts and basic and emergency lighting along with delivery and installation of low voltage switchboard and central battery

  • Amber-Glass Sp. z o.o. – Electrical and assembly works in the plant in Chorzów

  • Skanska S.A. – Comprehensive internal and external electrical systems for Steel Structure Painting Plant in Bukowno

  • ERBUD S.A. – Complete electrical installation inside the new building of psychiatric hospital in Tarnów along with complete installation of the infrastructure (transformer station, medium voltage network, outdoors lighting)

  • ERBUD S.A. – Complete installation of the infrastructure (transformer station, medium voltage network, power supply, outdoors lighting) of a new district hospital in Wadowice

  • Stolzle Częstochowa Sp. z o.o. – Complete electrical installation of a new industrial hall of 11000 m2 with installation of the infrastructure (transformer station, medium voltage network, power supply)

  • Stolzle Częstochowa Sp. z o.o. – Electrical system, ICT system and fire alarm system for the reconstruction of the cold end unit of bathtubs

  • Stolzle Częstochowa Sp. z o.o. – Electrical system, services and lighting system in Resorting rooms

  • Stölzle Lausitz GmbH – medium voltage power supply of a production hall, electrical installation of medium voltage and low voltage – construction of power supply in Weisswaser

  • Stölzle Lausitz GmbH – Cable ducts, illumination, emergency lighting, electrical measurements

  • Stölzle Lausitz GmbH – Cable ducts, extra light for workstations, emergency lighting, renovation sets

  • Stolzle Wymiarki Sp. z o.o. – medium voltage power supply for the production hall, medium voltage and low voltage electrical systems. Complete electrical system of the new industrial hall along with the infrastructure (transformer station, medium voltage network, power supply of the hall)

  • Stolzle Wymiarki Sp. z o.o. – basic and emergency lighting installation in the warehouse number 3

  • Stolzle Wymiarki Sp. z o.o. – Outdoor electrical system, i.e. outdoor lighting installation and power supply of the reception

  • Stolzle Wymiarki Sp. z o.o. – Lightning protection system in the building – bathtub hall, cold end hall, mixing room, compressor room, silos and warehouse of pallets

  • Stolzle Wymiarki Sp. z o.o.Conduits for electrical system

  • Stolzle Wymiarki Sp. z o.o. – Three-phase power system and lighting installation in the sand storage building and in the compressor building.

  • PPHU Stach – Comprehensive electrical system in the production hall.

  • Usługi Ogólnobudowlane Robert Dubowski – installation of electrical systems in flats in Żory.

  • ElektriMont Sp. z o.o. – electrical works in the Buma DOT A construction sites in Cracow and in the Ferrero Plant in Belsk Duży.

  • Unima 2000 Systemy Teleinformatyczne S.A. – Comprehensive indoors electrical system and comprehensive infrastructure installation (transformer station, medium voltage network, power supply, outdoors lighting) in the University Clinical Centre in Wrocław.

  • Protech Motors Industrial Services Sp. z o.o. – Comprehensive electrical system (switchgear, power cabinets, cable ducts) in Globau Sp. z o.o. in Ozimek

  • OCMER Sp. z o.o.– Electrical system in a steel shelter in Świebodzice for PPHU Defalin Group S.A.

  • Zakład Przetwórstwa Mięsnego CSS Sp. z o.o. – Modernization of electrical systems.

  • Saint-Gobain Innovative Materials Polska Sp. z o.o.– Renovation of street lighting installations, relocation of control cabinets, replacements of contact elements in the ????

  • Centrum Logistyczno-Magazynowe Maro in Olkuszu – Comprehensive installation of electrical system of a production hall

  • Unima 2000 Systemy Teleinformatyczne S.A. – Comprehensive installation of electrical system in a newly renovated neonatal unit in the district hospital in Tarnów.

  • Erbud Sp. z o.o. – Comprehensive installation of electrical system in the district hospital in Krosno, 2nd stage (start-up of the system installed in the 1st stage)

  • Saint-Gobain Polska Sp. z o.o. Glassolutions Unit – Design and installation of emergency lighting in a production hall in Jaroszowiec.

  • Unima 2000 Systemy Teleinformatyczne S.A. – Cabling of cogeneration equipment in the district hospital in Tarnów.

  • Certus Sp. z o.o. – Comprehensive installation of electrical system of a production hall along with installation of infrastructure (Transformer station, medium voltage network, power supply)

  • Kolb Sp. z o.o. – Comprehensive electrical system of Bilstein production hall in Wolbrom

  • Zdania Sp. z o.o. –Installation of BMS (Building Management System) in Rondo Business office building

  • Stolzle Sp. z o.o. – Design and implementation of fire alarm in a warehouse of finished goods of 16,000m2 area.

  • Unima 2000 Systemy Teleinformatyczne S.A. – Installation of Sound System in Quatro Businness Park office building

  • Zdania Sp. z o.o. – Installation of BMS (Building Management System) in Quatro Business Park office building

  • ERBUD S.A. – Comprehensive installation of electrical system in pediatric and gynecological units in a district hospital in Wadowice.

  • Unima 2000 Systemy Teleinformatyczne S.A. – Electrical system of hyperbaric unit in Rydygier hospital in Kraków

  • Stolzle Sp. z o.o. – Comprehensive installation of electrical system in a warehouse of finished goods of 16,000m2 area.

  • EcoRecycling Sp. z o.o. – Installation of power supply of production hall in Olkusz

  • TA Hydronics – Installation of power supply of production hall in Olewin

  • ETA– Feeding line outside buildings in Dąbrowa Górnicza

  • PPHU Algas Sp. J. Poultry abbatoir – Design and implementation of electrical system in Dąbrowa Górnicza

  • PPHU Stach– installation of electrical system in a factory in Olkusz

  • GrzanPol Sp. J.– installation of electrical system in a factory in Bukowno

  • Witzenmann Polska Sp. z o.o. – installation of electrical system in a factory in Olewin

  • HTS Spaczyńscy Sp. z o.o – installation of lighting system in a storage site in Chorzów Batory

DESIGN AND ASSEMBLY WORKS:

  • Glaston Finland OY – Comprehensive installation and start-up of a furnace for tampering glass in Jeld-Wen Glass in Australia

  • Glaston Finland OY – Comprehensive installation and start-up of a furnace for tampering glass in Modern Glass in Australia

  • Glaston Finland OY – Installation and a furnace for tampering glass in Flat Glass Industries Pty, Ltd in Australia

  • Glaston Finland OY – Comprehensive installation and start-up of a furnace for tampering glass in Viridian Glass Limited Partnership in New Zealand

  • Glaston Finland OY – installation of a furnace for tampering glass in Correns Corporation in Japan

  • Glaston Finland OY – Disassembly of a line and installation, start-up of a furnace and a line for tampering glass in the Vismara Vetro S.R.L. plant in Italy.

  • Glaston Finland OY – Comprehensive installation and start-up of a furnace for tampering glass in Vetraria Bergamasca Tecnovetro S.R.L. plant in Italy.

  • Glaston Finland OY – Comprehensive installation and start-up of a furnace for tampering glass in Village Glass Ltd in Great Britain.

  • Glaston Finland OY – Loading of a furnace for tampering glass in Joh. Sprinz GmbH & Co.KG in Germany

  • Glaston Finland OY – Supervision of installation of a furnace for tampering glass in Akces in Sosnowiec

  • Glaston Finland OY – Installation works in PressGlass plants in Tychy and Radomsko

  • Techglass Sp. z o.o. – Electrical and installation works in Saudi Arabia

  • Techglass Sp. z o.o. – Electrical and installation works in Vetropack plant in Ukraine

  • Techglass Sp. z o.o. – Installation of bottle unloading line and cabling of control cabinets in glass factory in Trąbki.

  • Installation of electrical system of a furnace for shaping and tampering automotive glass in a factory in Shanghai, China.

  • Kuchenmeister GmbH – Complete renovation and start-up of a furnace and processing lines for food production in a plant in Soest.

  • Kuchenmeister GmbH – Renovation works of processing lines for food production in a plant Jaus Bakery GmbH in Weißenhorn

  • PressGlass S.A. – Installation of a furnace in Glaston ProBend in a plant in Tychy

  • PUT Firmus Sp. z o.o. – Cabling of MF furnace chambers

  • Cegelec Sp. z o.o. – Relocation of machines in a plant Faurecie Wałbrzych S.A. in Wałbrzych

  • Cegelec Sp. z o.o. – Relocation of a plant Johnson Electric Poland Sp. z o.o. from Dąbrowa Górnicza to Będzin.

  • Cegelec Sp. z o.o. – Relocation of a plant Johnson Matthey Battery Systems Sp. z o.o. in Gliwice

  • Cegelec Sp. z o.o. – Installation works in Procter&Gamble Sp. z o.o. in Warsaw

  • GE Power Controls Sp. z o.o. – Servicing and repair in Romania to control the correctness of mechanical installation and cabling

  • GE Power Controls Sp. z o.o. – Installation of switchgears and connection of busbars for heat and power plant Veolia Energia Łódź

  • W. GALMET S.C. – Design, prefabrication and start-up of control cabinet of LE250C press.

  • MC Diam Sp. z o.o. – Supervision of deinstallation and installation of Tamglass furnace.

  • Ineco Sp. z o. o. – Construction design of electrical and low-current systems and detailed design of electrical system of Sopp Packaging Warehouse in Kamienna Góra.

  • P.H.U MATMECH Mateusz Mrówka – design of modification in controlling work stations which constitute a part of production line in Dąbrowa Górnicza

  • P.H.U ANKOP Anatol Wrona – Design and upgrade of the system controlling the aggregate crushing and sorting line in a gravel pit.

  • PressGlass S.A. – Relocation of production lines (Glaston, Lisec, Bystronic, Hegla)

  • PressGlass S.A. – Relocation of tempering furnace Lisec from the plant in Tychy to the plant in Radomsko

  • Glaston Finland OY – Complete installation and start-up of the furnace for glass tempering in Flachglas Wernberg GmbH + Co. KG in Germany

  • Glaston Finland OY –Installation and start-up of the furnace for glass tempering in SVOBODA Sklenarstvi S.R.O plant in Czech Republic

  • PressGlass S.A.Relocation of tempering furnace Lisec from the plant in Tychy to the plant in Radomsko

  • PUT Firmus Sp. z o.o. – Installation of tempering furnace in Saint Gobain Seva

  • Glaston Finland OY – turnkey installation of a furnace in Nakajima Glass Kogyo Co. Kanto Factory in Japan

  • COVAC Elektro und Automation GmbH – Development of the control system in Reoil Sp. o.o. in Bukowno

  • Emerson Process Management Sp. z o.o. – Coordination and completion of works connected with cabling and connection of Control Measurement Instruments and Automation devices for the construction of fluidized-bed furnace for the EC Synthos Dwory 7 plant in Oświęcim

  • Pak-Gum Sp. z o.o. – Design and completion of control system for the aggregate crushing and sorting line for dla Krakowskie Zakłady Eksploatacji Kruszywa S.A. plant

  • ETP S.A. – completion of Loop checks for ASU Turek plant

  • PressGlass S.A.Relocation of production lines (Glaston, Lisec, Bystronic, Hegla)

  • ETP S.A. – electrical installation works connected with the construction of the plant VW Crafter in Września

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the Schulte Duschkabinenbau GmbH Co. KG plant in Germany

  • Elektromontaż Poznań S.A. – installation of cable routes connected with the construction of the VW Crafter plant in Września

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the plant Bohamet S.A. in Białe Błota

  • Saint-Gobain Polska Sp. z o.o.– Renovation works by the installation of Glaston furnace in a design unit in Pruszków

  • Veolia Water Technologies Sp. z o.o. – Extension of installation controlling the processing water purifiers in the plant Kelloggs Kutno

  • Stölzle Lausitz GmbH – Delivery of low-voltage distribution panels for the production hall

  • SimTec Sp. z o.o. – Upgrade of Magnetron line in the plant Saint-Gobain Glass Polska Sp. z o.o.

  • Syntmet Paweł Rogal – Completion of works connected with start-up of electrical installations in a service building in Wolbrom

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the Isotherm S.R.O plant in Czech Republic

  • Glaston Finland OY – turnkey installation in the plant Nakajima Glass Kogyo Co. Kanto Factory in Japan

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the plant Art-Diame in Słupia

  • Kuchenmeister GmbH (for Audrey Cake GmbH) – Complete renovation and start-up of a furnace in Thule

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the plant ERTL Glas S.R.O in Czech Republic

  • Krakowskie Zakłady Eksploatacji Kruszywa S.A. – Delivery control power cabinet of the power pump

  • SIMPLE Sp. z o.o. – Installation of low-voltage and computer networks

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace in the plant EControl-Glass GmbH Co. KG in Germany

  • Glaston Finland OY – disassembly and installation of FC500 glass tempering furnace upgrade in the plant System 3 Ltd in Great Britain.

  • Glaston Finland OY – Complete renovation of a glass tempering furnace in Austria

  • Glaston Finland OY – Complete installation and start-up of FC500 glass-tempering furnace in the plant Drutex S.A. in Bytów (Polska)

  • Protech Motors Industrial Services Sp. z o.o. – Relocation and complete electrical installation of machinery in the plant Globau Sp. z o.o. in Ozimek

  • Protech Motors Industrial Services Sp. z o.o.– Relocation, installation of processing lines for production of nonwoven geotextiles.

  • MJ Group – Installation of processing line for production of car seats.

  • F.P.H.U. WERKAM Krzysztof Badura – Completion, delivery installation and start-up of control cabinets for 3 lehrs.

  • Pilkington IGP Sp. z o.o. – Installation of a glass tempering furnace in Szczecin

  • Pilkington Automotive Poland Sp. z o.o. – Relocation of work stations from the site of Chmielów to to the site of Machów.

  • Stolzle Częstochowa Sp. z o.o. – Cabling for Fire Alarm System for a warehouse of finished goods.

  • Stolzle Częstochowa Sp. z o.o. – LAN installation in the Decorations Unit.

  • Kuchenmeister GmbH (dla Dan Cake Sp. z o.o.) – Complete installation and start-up of a tunnel kiln

  • Stolzle Częstochowa Sp. z o.o. – upgrade of a control system and replacement of a control cabinet of K12, K12 lehr in the Decorations Unit.

  • Glaston Germany GmbH – Turnkey installation of RC200 1530 FC500 furnace in Glasbearbeitung Thoelken Peter Thoelken e.K. in Germany

  • Glaston Finland OY – Complete installation and start-up of a glass tempering furnace RC350 in Costan SPA in Italy

  • Erbud S.A. – Complete electrical installation and cabling of cogeneration equipment in the boiler house of John Paul II Hospital in Cracow.

  • Saint-Gobain Glass – Electrical installation of Grenzebach lines

  • Signum Project Sp. z o.o. – Installation of low current circuit (fire alarm, voice alarm system, cable ducts) in A and B buildings of Skanska company in Cracow.

  • MJ Group – Cabling of control system of a new production line – cabling of new and upgraded production machines in Kellogg’s Kutno

  • MJ Group – Cabling of control system of a new production line in Colgate Świdnica

  • Glaston Finland OY – Complete installation and start-up of FC500 glass tempering furnace in Italy

  • Kopalnia Kwarcytu „Dziewiątle” Stanisław Latoch – Design and completion of control system of aggregate crushing and sorting linen

  • Glaston Finland OY – Complete installation and start-up of FC200 glass tempering furnace in Schollglas Technik GmbH Lommatzsch in Germany

  • Glaston Finland OY – Complete installation and start-up of FC500 glass tempering furnace in Joh. Sprinz GmbH & Co.KG in Germany

  • Pak-Gum Sp. z o.o. – Design and completion of control system of aggregate crushing and sorting lines in Łańcut

  • Metso Minerals Polska Sp. z o. o. – Completion of control cabinet of LT105 jaw crusher.

  • Glaston Finland OY – Complete installation and start-up of FC500 glass tempering furnace in Hodonin in Czech Republic.

  • Pilkington IGP Sp. z o.o. – Installation of Glaston glass tempering furnace in a plant in Skierniewice.

  • Huta Aluminium Konin – Replacement of equipment and control system of LCW2 and LOP production lines commissioned by Rockwell Automation

  • OknoPlast Sp. z o.o.– Installation of a glass tempering furnace in a plant in Ochmanów

  • Huta Aluminium Konin – Installation of a safety circuit for aluminum rolling. Part of exchange of control system commissioned by Rockwell Automation.

  • PUT Firmus Sp. z o. o. w Olkuszu – Electrical works and measurements of Vabene and MF glass tempering furnace chambers

  • Kimberley Clark S.A. – installation of control system of tissue production lines in a plant in Klucze, commissioned by Rockwell Automation

  • Saint-Gobain– Electrical works commissioned by Gauthey Automatismes during installation of RNT glass tempering furnace in Berlin

  • Saint-Gobain Glass– Electrical works during a start-up of a Hager-brand laminate production line in a plant in Dąbrowa Górnicza

  • Algas Sp. J. – Design, installation and start-up of control system of gas fired lehr in a plant in Jaroszowiec

  • SlagRecycling Sp. z o. o. – Design, installation and start-up of an aggregate sorting line in Bielcza-Krężel

  • Saint-Gobain Glass– retrofit of VSG glass cutting table control system in a plant in Dąbrowa Górnicza.

  • Saint-Gobain Glass– refrofit CSP glass packaging table in a plant in Dąbrowa Górnicza

  • IMI International Sp. z o. o.– installation of Rippert automatic washing and painting lines in a plant in Olewin

  • IMI International Sp. z o. o.– electrical works in the course of installation and start-up of a Omera in a plant in Olewin